Featured Collection
Backpacks
-
QE Tote bag
Regular price $24.99 USDRegular priceSale price $24.99 USD -
QE StreetGuard Backpack
Regular price $59.99 USDRegular priceSale price $59.99 USD -
QE Top Gear BackPack
Regular price $129.99 USDRegular priceSale price $129.99 USD -
QE BackPack Blue/White
Regular price $79.99 USDRegular priceSale price $79.99 USD
1
/
of
2
Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy
Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy
Regular price
$17.99 USD
Regular price
$45.00 USD
Sale price
$17.99 USD
Quantity
Couldn't load pickup availability
In stock
Description:
- LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background
- GREAT DESIGN- The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off
- LONG DOG LEAD- Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs
Brand Name: STEVVEX Pets
Model Number: ST12DB786GBI
Type: Leashes
Dog Leash Type: Basic Leashes
Material: Nylon
Type: Dogs
Season: All seasons
Pattern: Solid
Feature: Personalized
Feature: outdoor training dog leash rope
Use for: puppy, small medium and large dog belt
Use for 1: training, running dog lead
Share

Featured Hats Collection
-
Unisex Thick Knit Beanie
Regular price $29.99 USDRegular priceSale price $29.99 USD -
QE Embroidered Beanie
Regular price $29.99 USDRegular priceSale price $29.99 USD -
QE Red Embroidered Beanie
Regular price $29.99 USDRegular priceSale price $29.99 USD -
QE Green Embroidered Beanie
Regular price $29.99 USDRegular priceSale price $29.99 USD


